No. |
Location |
Name of Power Station |
Capacity(MW) |
Contract |
Type |
Quantity |
Supply Scope |
1 |
Pakistan |
Bin Qasim Combined Cycle Power Station |
560 |
Turnkey |
|
|
|
20 |
| Dongola/Wadi Halfa Transmission Lines |
400KM 220KV |
Turnkey |
|
|
|
20 |
Turkey | Damlapinar Hydropower Project |
2×8.3MW |
Turnkey |
|
|
|
20 |
Turkey | Kepezkaya Hydropower Project |
2×16.9MW |
Turnkey |
|
|
|
20 |
Turkey | Kumkoy Hydropower Project |
3×5.75 |
Turnkey |
|
|
|
20 |
Vietnam | Camoga II Coal Fired Thermal Power Plant |
1×300 |
Turnkey |
|
|
|
20 |
Indonesia | Paiton TPP |
1×660 |
Turnkey |
|
|
|
20 |
Vietnam | Campha I Coal Fired Thermal Power Plant |
1×300 |
Turnkey |
|
|
|
20 |
| Merowe Dam Transmission Lines |
1750km |
Turnkey |
|
|
|
20 |
Bangladesh | Sylhet 9E CCPP |
90 |
Turnkey |
|
|
|
20 |
| Garri 400MW Combined Cycle Power Plant (each block 2:2:1) |
400 |
Turnkey |
|
|
|
20 |
Pakistan | Malakand III Hydropower Project |
3×27 |
Turnkey |
|
|
|