Chinese | English | Русский | Español
 
HOME ABOUT US PRODUCTS & SERVICES NEWS CENTER CAREERS CULTURE CONTACT US
· Power Plant Overhauls
· Boiler Modifications
· Turbine Modifications
· Turbine Generator
  Modifications
· Hydraulic Generator
  Set Modifications
· Spare Parts
  • /Public/hdgj/images/fw/5/1.jpg

  • /Public/hdgj/images/fw/5/2.jpg

  • /Public/hdgj/images/fw/5/3.jpg

  • /Public/hdgj/images/fw/5/4.jpg

  • /Public/hdgj/images/fw/5/5.jpg

 

HEI can renovate and modify all the systems of hydraulic turbines and generator units, including seat rings, bottom rings, guide vanes, top covers, control rings, guide bearings, runners, main shafts, main shaft seals, runner ventilators, servomotors, stators, stator cores, rotors, pole coils, upper brackets, lower brackets, thrust bearings, braking systems, neutral points, coolers, firefighting devices, illuminating devices, oil and water pipelines, and excitation systems.

 

Experience Records for Hydro Turbine & Hydro Generator Renovation and Reformation
Power Plant Units and Renovation Scope Unit Capacity before Transformation (MW) Unit Capacity after Transformation (MW)
Banglang, Thailand Hydro Turbine & Hydro Generator Unit 1-3 28 32
Kainji, Nigeria Hydro Turbine & Hydro Generator 2*120+1*100 2*120+1*100
Chulabhorn, Thailand Hydro Turbine & Hydro Generator Unit 1-2 21.24 21.24

 

 

 
Copyright:HARBIN ELECTRLC INTERNATIONAL COMPANY LIMITED
Tel:+86-451-58591111 Fax:+86-451-58596666 Post: 150028 Address: No.1299 Chuangxinyi Road, Songbei District, Harbin, China